Subscribe to Blog via Email
Join 6 other subscribersRecent Comments
- Patrick on Finished Paint and Final Assembly
- Neil Traver on Dash, Gauges and More
- Neil Traver on Clutch and Throttle Cable and Engine Wiring
- Neil Traver on Clutch and Throttle Cable and Engine Wiring
- Neil Traver on More Progress on Engine and Next Steps
Links
Categories
- Accelerator Pedal
- Accessory plug
- Air cleaner
- Alignment
- Aluminum Panels
- Battery
- Battery Box
- Battery disconnect
- Body Paint
- Brake Pedal
- Brake reservoir
- Build School
- bulb seal
- Cable
- Carpet
- Clutch Pedal
- Cockpit
- Dash
- Diode
- door
- Drive Shaft
- E-brake boot
- EFI
- Engine
- filler
- Flaring Tool
- Footbox
- Front brakes
- Front end
- Front suspension
- Fuel Filter
- Fuel Pump
- fuel pump pick-up
- Fuel System
- Fuel tank
- Gauges
- Ground strap
- Headers
- Heater vents
- heater-defroster
- hood
- Ignition
- Indicator lights
- Insulation
- J pipes
- Kit Info
- level probe
- Master Cylinder
- Mirrors
- O2 Sensor
- Oil relocation
- Panhard
- Parts
- Pedal Box
- Radiator
- Rage Gold
- Rear axle
- Rear Brakes
- Rear end
- Rear Suspension
- remote battery terminal
- Ride height
- Roll Bars
- sanding
- scoop
- seam
- Seat Belts
- Seat heaters
- seat tracks
- Seats
- Shifter boot
- Shop set-up
- Side Exhaust
- Sliders
- Speakers
- Starter
- Starter index plate
- Steering rack
- Steering Wheel
- Stereo
- Stripes
- Switches
- Transmission
- Trun signals
- Trunk
- Uncategorized
- Weatherpack
- weatherstrip
- welcome
- Wheels
- windshield
- wiper
- Wiper motor
- Wiring harness
Tags
Author Archives: dan
Rear Suspension Completed
Back at work on the rear brakes, approved I found that with a couple of washers included, esophagitis the calipers and rotors lined up very well. So, that being completed, we went to work on the lower control arms so … Continue reading
Rear Axle, Rear Suspension and Brakes
Back at work on the rear brakes, approved I found that with a couple of washers included, esophagitis the calipers and rotors lined up very well. So, that being completed, we went to work on the lower control arms so … Continue reading
Front Suspension and Brakes
Back at work on the rear brakes, approved I found that with a couple of washers included, esophagitis the calipers and rotors lined up very well. So, that being completed, we went to work on the lower control arms so … Continue reading
New Parts and Tools and Miscellaneous Stuff
We have been getting new parts for the past month, pills so little by little we are almost complete. Only a few things left in the kit to receive, ambulance plus a few additional items that I want to get. … Continue reading
Engine Ordered
Welcome to the Dan and Pat Build a Roadster Build Site! We are building a Factory Five Mk4 Roadster. Follow along with us as we put our Roadster together. We will keep you updated with details, look pictures, stomach customizations, … Continue reading
Pickup in a few days
We are scheduled to pick up our roadster this Saturday from Factory Five’s offices in Wareham, patient Mass. We are driving up Friday with a truck and trailer so we can bring it home ourselves. We made some last minute … Continue reading
Body Buck Completed
The body buck was completed a couple of weeks ago to be ready for picking up the kit. I followed the directions and blueprint in the assembly manual. It was a bit confusing at times trying to get all … Continue reading
Details About Our Kit
Take a look at the “Build Info” link to see some of the details of the kit we ordered. Still doing a lot of searching for where to get the engine. We originally were thinking a 351w so ordered the … Continue reading